Skip to content

X-03FAQ

Questions, answered.

Timelines, permits, payments and what it’s like to live through a renovation. If your question isn’t here, call or message us.

X-03.1General

Working with us.

  1. How long does a typical renovation take?

    It depends on the size of the space, the scope and how long materials take to arrive. After we see the space and agree on the scope, we give you a written schedule before work starts and keep you updated if anything changes.

  2. Do you handle permits and drawings?

    Where your project needs a permit or drawings, we tell you at the start and coordinate the process with you and the municipality, so inspections are booked at the right stages.

  3. Can we live at home during the renovation?

    In most cases, yes. We plan the work around your household, keep the work area separated and tell you ahead of time about any days when water, power or a room will be unavailable.

  4. Do you supply materials, or can we choose our own?

    Either works. We can source materials through our suppliers, or install finishes you choose yourself. We’ll help you check sizes, quantities and lead times either way.

  5. How do payments and deposits work?

    Every project starts with a written quote that sets out the payment schedule. Payments are tied to clear stages of the work, so you always know what you’re paying for.

  6. What warranty do you provide?

    Our work is backed by our workmanship warranty, and manufacturer warranties on products and materials are passed on to you. We go over the details with you before the project starts.

  7. Which areas do you serve?

    We work in Barrie, Collingwood and the surrounding area. If you’re nearby and not sure, call or message us and we’ll let you know.

  8. Will you keep the house clean while you work?

    Yes. Work is contained to the area we’re renovating, floors are protected, and we clean up at the end of every day.

  9. Are you licensed and insured?

    Yes. Ace Contracting is fully licensed and insured, and we’re happy to provide proof of coverage before work begins.

X-03.2Additions & Extensions

Additions & Extensions.

  1. Will the addition match the rest of the house?

    That’s the goal. We plan rooflines, siding or brick, windows and interior finishes so the new space ties into the existing house inside and out.

  2. Do additions need a permit?

    Almost always. We prepare for the permit with you, coordinate the drawings and book inspections at each stage, so the addition is built to the approved plans.

  3. Can we stay in the house while you build?

    Usually, yes. Most of the work happens outside the existing walls until we tie in. We plan that stage carefully and tell you ahead of time when it’s coming.

More about additions & extensions →

X-03.3Custom Garages & Shop Builds

Custom Garages & Shop Builds.

  1. Can you build a detached garage or workshop?

    Yes. We build detached and attached garages and shop buildings, and plan the foundation, framing, power and finishes around how you’ll use the space.

  2. Can you convert our garage into living space?

    Yes. Garage conversions into a gym, hobby room, office or living space are a good fit. We look at insulation, heating, flooring and doors so the room is comfortable all year.

  3. Do garages need a permit?

    New garages and most conversions do. We check what your municipality requires and coordinate the permit and inspections with you.

More about custom garages & shop builds →

X-03.4Secondary Suites & ADUs

Secondary Suites & ADUs.

  1. Can my basement become a legal second suite?

    Many can. It depends on things like ceiling height, exits, fire separation and parking. We look at your home with you and explain what it would need before you commit.

  2. Who arranges the drawings and inspections?

    We coordinate the drawings, permit and inspections with you, so the suite is built to the approved plans and signed off at each stage.

  3. Can we rent it out when it’s done?

    That’s the goal of building it to pass. Once the permit is closed, you’ll have the paperwork that shows the suite was built and inspected as a legal unit.

More about secondary suites & adus →

X-03.5Whole-Home Renovations

Whole-Home Renovations.

  1. Why renovate the whole house at once?

    Doing it together means one plan, one schedule and one team. Trades are sequenced across the house instead of coming back for each room, and the finishes work together.

  2. Can we live at home during a whole-home renovation?

    Sometimes, depending on the scope. We’ll talk through phasing with you, and if staying isn’t practical for part of the work, we plan it so that stretch is as short as possible.

  3. Who manages the project?

    We do. As your general contractor, we coordinate the trades, the schedule, materials, permits and inspections, and keep you updated at every stage.

More about whole-home renovations →

X-03.6Kitchens

Kitchens.

  1. Can you remove a wall to open up the kitchen?

    Often, yes. We check first whether the wall is load-bearing or carries plumbing, wiring or ductwork, and if it does, we plan the structural work and any permit it needs before anything comes down.

  2. Can we keep our layout and just update the finishes?

    Absolutely. Refacing, new counters, a new backsplash and better lighting can transform a kitchen without moving plumbing or walls. We’ll walk you through what gives the most impact for your budget.

  3. Will we have a working kitchen during the renovation?

    There will be a stretch without a full kitchen. We plan the order of work to keep that as short as we can and can help you set up a temporary space for the fridge and a few small appliances.

More about kitchens →

X-03.7Bathrooms

Bathrooms.

  1. How do you waterproof showers?

    Every wet area gets a proper waterproofing membrane behind the tile, not just a moisture-resistant board, with careful detailing at corners, niches, benches and the drain.

  2. Can you build an accessible or curbless shower?

    Yes. We build walk-in and curbless showers, and we can add blocking for grab bars, a bench and a handheld shower so the room works now and later.

  3. Can we change the layout, like moving the toilet or the tub?

    Usually, yes. Moving fixtures means reworking plumbing and drains, so we confirm what’s possible in your space before we quote.

More about bathrooms →

X-03.8Basements

Basements.

  1. How do you handle moisture?

    We look for signs of moisture before we start and deal with the source first. Then we use insulation and wall assemblies suited to below-grade walls, so the finished space stays dry and comfortable.

  2. What ceiling height do we need?

    It depends on how the space will be used and on the building code requirements for that use. We measure during the walkthrough and plan around ducts and beams to keep as much height as possible.

  3. Do we need an egress window?

    A bedroom in a basement needs a window or door that meets the code for escape. We check your existing windows and let you know if one needs to be enlarged or added.

More about basements →

X-03.9Renovations & Repairs

Renovations & Repairs.

  1. Do you take on small repairs as well as big projects?

    Yes. Call or message us with what you need and we’ll let you know how we can help.

  2. What if you find a problem behind the walls?

    It happens in older homes. We stop, show you what we found, explain the options and agree on any change in writing before we carry on.

  3. Can you renovate a whole floor at once?

    Yes. Opening up a main floor, new flooring throughout, stairs and feature walls are some of our favourite projects, and doing it together usually saves time and disruption.

More about renovations & repairs →

X-03.10Decks, Porches & Exterior

Decks, Porches & Exterior.

  1. What materials can you build a deck with?

    We’ll go over the material options with you, how each one holds up through our winters and what upkeep it needs, then build with what suits your budget and the look you want.

  2. Do decks need a permit?

    Some do, depending on height, size and how they attach to the house. We check the rules for your municipality and handle the permit when one is needed.

  3. When is the best time to book outdoor work?

    Outdoor work depends on the weather, so spring and summer book up first. Reaching out early gives you the most choice of dates.

More about decks, porches & exterior →

Start a project

Ready when you are.

Tell us about your project and we’ll get back to you.